HOUSE KITSETS BUILT TO LOCK-UP

 

Stage 1 House Kitset built to Lock-Up

Ø      Kitset delivered to and off loaded on site within Victoria.

Ø      Foundation system as concrete stumps, treated pine bearers and joists, Laminex wet area sheet flooring with R1.5 subfloor insulation. Priced on level sites.

Ø      Erection of all walls, fixing of roof completely, fitting windows, external doors and the fitting of the external insulation and half planks.

Ø      EXCLUDES fitting internal doors, cover strips and flat pine ceiling.

Ø      EXCLUDES all general plumbing and electrical.

Ø    Items NOT included in kitsets built to lockup: planning permit - floor coverings - heating - any service costs e.g: electricity, gas, storm water disposal, sewerage and mains water - site preparation, earth work or removal of rock.

 

Stage 2 House Kitset built to Lock-Up

Ø      As stage 1 house kitset built to lock-up and includes the supply of all items as mentioned in stage 2 house kitset for you to install.

 

Stage 3 House Kitset built to Lock-Up

Ø      As stage 1 & 2 house kitset built to lock-up and includes the supply of all items as mentioned in stage 3 house kitset for you to install.